P-06b - Lake Wilderness Park Parking Lot Improvements Project

Print

            P-06b Park Parking Lot Improvements 031215                P-06b Park Parking Lot Improvements - After 050615                                                                                                                           After

 

Click here for more P-06b Project Information                                                                        

All work shall be completed in 40 working days and by no later than May 31, 2015, which consists of furnishing all materials, equipment, tools, labor, and other work or items incidental thereto for:

  • Removal and waste haul of removed trees
  • Removal of existing landscaping

Scope of work - The purpose of this contract is to provide a hard surface for the existing parking lot for the Lake Wilderness Park.  This project will include paving the existing lot and required striping, the installation of a drainage system and construction of a bios-wale for water quality treatment.  The Parking Lot will be paved with 3” HMA over 6” Crushed Surfacing Base Course.  Improvements will also include concrete extruded curb around the perimeter of the parking lot and the installation of a fiber-optic connection with conduit underneath the length of the parking lot connected to hand-holes for future fiber-optic under-grounding. The grades of the proposed parking area will not significantly change from the existing grades. 


 

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Flash Player QuickTime Windows Media Player Microsoft Silverlight Word Viewer Excel Viewer PowerPoint Viewer